Northlink WA – Stage 3 Bridges Monford Group/CPB Contractors – Main Roads Western Australia

  • Client:
    Monford Group / CPB Contractors for Main Roads WA
  • Location:
    Perth Metro – Morley to Ellenbrook Corridor
  • Project Type:
    Highway & Bridge Construction
  • Timeline: 2021

Project Overview


Alliance Surveying was engaged by Monford Group and CPB Contractors to deliver comprehensive surveying support for bridge infrastructure on Stage 3 of the Northlink WA project. This phase of the state-significant transport upgrade focused on constructing multiple bridges and associated road infrastructure between Morley and Ellenbrook, transforming northbound connectivity across Perth’s growing outer suburbs.


Our projects were led by licensed land surveyors and supported by our broader in-house team of field staff and technical professionals. Together, they provided full surveying services for critical structures, including bridge piers, abutments, noise walls, and safety barriers. Working within live traffic environments and complex work zones, we ensured every component was constructed to design with millimetre accuracy, supporting safe and efficient delivery of this essential road infrastructure.



Key aspects of the project include:

Scope of Works

Alliance Surveying’s role included:

  • Control network design and installation across multiple bridge locations
  • Structural set-out of bridge decks, piers, abutments, and parapets
  • Surveying of noise walls, retaining structures, and crash barriers
  • As-built surveys at each construction milestone
  • Topographic detail and cross-sectional data for verification and handover
  • CAD and BIM-compatible deliverables for engineering and compliance teams

All works were completed under strict Main Roads WA specifications, with daily coordination across multiple contractors and service crews.

Challenges & Solutions

  • Multi-staged urban delivery: We operated within constrained road corridors alongside live traffic, scheduling our works around lane closures and traffic switches.
  • Complex structural sequencing: Multiple bridge types and variable alignments required customised survey solutions and seamless data transition across stages.
  • Tight delivery timelines: With project sequencing reliant on accurate set-out, our fast mobilisation and real-time data updates helped maintain the construction program without delays.

Our ability to work closely with Monford, CPB, and Main Roads WA ensured survey data was integrated into construction workflows, minimising rework and supporting structural quality assurance.

Results & Key Benefits

  • Surveying commenced within 7 days of engagement, with fixed pricing from day one
  • Delivered millimetre-accurate control and set-out for multiple bridge structures
  • Enabled real-time QA processes and early issue detection through as-built validation
  • All work delivered by our in-house team, led by licensed surveyors and supported by skilled technical staff, with no reliance on subcontractors

Final deliverables fully integrated into digital project platforms for engineering teams

Partner with WA’s Trusted Bridge Survey Experts

From early control setup to final as-builts, Alliance Surveying delivers reliable, in-house expertise for major bridge and highway projects.

Visit our Contact Us page to request a free fixed-price quote and learn how our team can support your next infrastructure build across Perth or regional Western Australia.

Why Alliance Surveying?

Fast Turnaround:

All quotes are delivered within 2 days, guaranteed.

Swift Project Start:

Job commencement is guaranteed within 7 days of approval, so your project won’t face delays.

Transparent Pricing:

Our quotes are fixed; if unexpected costs arise, we cover the difference, ensuring no surprise charges.

Fully In-House Team:

We never outsource. Every step of your survey is handled by our own team of 30 experienced professionals.

Frequently Asked Questions

We completed full control network setup, bridge set-outs, structural as-builts, noise wall and barrier surveying, and CAD deliverables.

By using robotic total stations, GPS equipment, and tight control tolerances, we delivered consistent accuracy across complex structures.

Yes. Our team worked safely around traffic staging plans and coordinated set-outs during night and off-peak hours to minimise disruption.

Yes. All surveying was overseen by licensed surveyors and supported by our in-house field and technical staff, with no subcontracting involved.

Yes. We provided BIM-compatible formats and coordinated data exchange with CPB and Monford’s engineering and QA teams.

No. Our fixed-price quote covered all survey requirements, even when field conditions shifted unexpectedly.

We were on-site within 7 days of approval, in line with our guaranteed mobilisation timeframe.

We conducted progressive and final as-builts to verify structure positions, bridge deck levels, and installation compliance.

Yes. We collaborated closely with civil crews, engineers, and Main Roads WA to ensure coordinated construction outcomes.

The easiest way is to visit our Contact Us page and submit your details. Our team will provide a tailored, fixed-price proposal within 48 hours.

Project Gallery


Other Projects

Enquire here