Alliance Surveying provided all surveying services for SRG for the design and construction of 2 x 5 mega litre storage tanks as part of the Onslow town water scheme.

The project included:

  • All site earthworks which included clearing, temporary roads, set out for pre load of the site, detailed earthworks for tank construction, and 4.5km of road construction
  • Set out and as constructed survey on pipeline connections to the town water supply
  • Establishment and monitoring of earthworks settlement monitoring system from beginning of preload, removal of preload and during the construction of the concrete tanks
  • Construction set out of the complex reinforced (post tensioned) concrete tanks
  • Produce as constructed drawings for Water Corporation submission